Potential Future Land Use Plan South
- residential infill should be focused within Enfield, Elmsdale and Lantz
- 700 acres shown as future residential development is sufficient for 30-40 years
![]()
Roads and Servicing
- water supply should be adequate into foreseeable future, but capacity of existing sewage treatment plant will be used up by about 2014
- much of land shown for residential infill is currently difficult to connect to regional sewage treatment system
- for future growth, would be wise to look at other side of Highway 102
- the Municipality should establish a hierarchical system of roads, and develop design standards that address the local conditions
- a new collector parallel to Highway 102 to the west of Trunk 2 is recommended
- a formal serviceable boundary line should be established for each community to provide control on development to the extent desired
- the easiest first step for any servicing outside the current serviceable boundary would be along Route 214
Next: Read other comprehensive municipal plansBack to: Table of Contents
This page and all contents are produced by the Atlantic Planners Institute, an affiliate of the Canadian Institute of Planners.
This document was last modified on October 7, 1999.